Weegy: Once the generator has returned to the staging area, it is either made ready for reuse in that event or it is made ready for return to the FEMA Distribution Center for storage. TRUE.
User: As part of the safety checklist that should be followed during generator installation, a facility POC should develop an Activity Hazard Analysis or a Job Hazard Analysis that identifies anticipated hazards and develops control measures to serve as a risk reduction tool.
A. TRUE
B. FALSE
Weegy: As part of the safety checklist that should be followed during generator installation, a facility POC should develop an Activity Hazard Analysis or a Job Hazard Analysis that identifies anticipated hazards and develops control measures to serve as a risk reduction tool. TRUE.
User: When is the provision of Temporary Emergency Power critical?
(More)